Conclusions
-
1.
The construction of permanent walls of reinforced Gunite and prestressed reinforced-concrete anchors reduces the consumption of materials and labor expenditures, which leads to a considerable economic advantage.
-
2.
The simplified wall design permits working the lower levels of the chamber without stopping side excavation, which shortens the construction time.