Skip to main content
Log in

Improvement of concreting technology during construction of the Riga hydroelectric station

  • At Target Construction Projects
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. O. A. Savinov, B. M. Erakhtin, A. M. Vonda, and V. A. Slen'kov, “Mechanized compaction of concrete mixes in large blocks of hydraulic structures,” Gidrotekh. Stroitel'., No. 7 (1974).

  2. Yu. M. Bazhenov, Concrete Under a Dynamic Load [in Russian], Stroiizdat, Moscow (1970).

    Google Scholar 

  3. A. G. Zotkin and O. A. Gershberg, “Effect of concrete composition on decrease of strength in the case of undercompaction,” Izv. VUZ. Stroitel'stvo i Arkhitektura, No. 4 (1971).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 12, pp. 5–7, December, 1974.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Lavrinovich, E.V., Litvinova, R.E. & Volkov, N.G. Improvement of concreting technology during construction of the Riga hydroelectric station. Hydrotechnical Construction 8, 1103–1105 (1974). https://doi.org/10.1007/BF02378369

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02378369

Keywords

Navigation