Engineering protection against flooding and ground-water inundation at the memorial town of Shushensk

  • Papers
  • On the Centenary of V. I. Lenin's Birth
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    Design and research work carried out by Lengidroproekt and Giprogor have provided a system of engineering measures for the protection of the territory, meeting the specific requirements of a small town with a large number of preserved and restored buildings.

  2. 2.

    Some of the early structures employed (gates, conduits) can be recommended for further study for the purpose of using them in the engineering protection of territories under similar conditions.

  3. 3.

    In order to obtain more precise parameters and operating conditions of the engineering protection installations under the planned conditions, gaging station readings, river bed and ice and temperature investigations should be continued in the lower pool of the Sayan-Shushensk hydroelectric station.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 26–31, April, 1970.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Shnaider, I.M. Engineering protection against flooding and ground-water inundation at the memorial town of Shushensk. Hydrotechnical Construction 4, 325–333 (1970). https://doi.org/10.1007/BF02378338

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02378338

Keywords

Navigation