Repair of pipe drainage system of a dam under active head

  • Promotion of Efficiency Through Exchange of Experience
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The piping of sand from the body of the dam in zone PK 42+80 and disruption of the reverse filter of the drainage system was the result of the poor quality of the reverse filter installation in the construction period.

  2. 2.

    Under conditions of active head on the dam, the repairing of a reverse filter, even in a small section of the drainage system, is very laborious work, which can be carried out under operating conditions in 45 days, and with better work organization in less time.

  3. 3.

    It is especially necessary to carry out the repair of the drainage system diligently during joining of the new reverse filter with the old one in the zones which are still sound, not permitting the fractions of the various mechanical compositions to become intermingled under the action of the longitudinal filtrations.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo. No. 6, pp. 47–48, June, 1968.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Popov, I.G., Shchukin, V.L. Repair of pipe drainage system of a dam under active head. Hydrotechnical Construction 2, 534–536 (1968). https://doi.org/10.1007/BF02378140

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02378140

Keywords

Navigation