Preliminary preparations for the construction of the Kolyma hydroelectric station

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

The preliminary-preparations period in hydropower construction should include a complex of first-priority operations for setting up the construction site. The items to be constructed during this period include entry bases and access and site roads; power-, water-, and heating-supply items; storehouses, repair shops concrete production plants of small capacity, etc.; and dwellings to accommodate 200 to 400 men per site. The preparations period in hydropower construction, as regards deadlines and schedules for the items to be constructed, should be determined by the design and construction organization, individually for each item, taking into account the local geographic and production-engineering conditions.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 25–26, August, 1974.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Frishter, Y.I. Preliminary preparations for the construction of the Kolyma hydroelectric station. Hydrotechnical Construction 8, 728–730 (1974). https://doi.org/10.1007/BF02378091

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02378091

Keywords

Navigation