Mechanical equipment at the Krasnoyarsk hydroelectric plant

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1)

    The adopted unification of the crest and spillway bays and standardization of the gate slots made it possible to use 2640 tons of steel elements for two different purposes, permanently. The rational design methods (use of conical blind flanges, etc.) permitted saving 700 tons of steel.

  2. 2.

    The location of the penstocks on the downstream face of the dam permitted simplifying considerably the placing of concrete in the dam, since this operation was not interrelated with the erection periods for the penstocks.

  3. 3.

    The especially designed grab beams and lugs in the gantry cranes, for automatic coupling with the spillway gates, made it possible to avoid the difficult and prolonged operations required for lifting the gates by means of rods.

  4. 4.

    The corrosion-control rooms, equipped with modern cleaning and painting equipment, permit improving the operating conditions of the mechanical equipment.

  5. 5.

    The especially designed mechanical equipment — of unprecedented characteristics in the Soviet Union-for the low-level outlets of the second-stage dam, for heads of up to 98 m, permitted the passage of the flows through the structures, during construction, for about three years.

  6. 6.

    The availability of a highly mechanized base, means of transportation, and high-capacity erection cranes made it possible during all the construction stages to carry out opportunely the preliminary assembling of the equipment, to transport it to the construction site, and to reduce the erection periods.

  7. 7.

    The widely-applied method of installing in concrete blocks the embedded parts for the gates and the trashracks, without using dentated concrete members, made it possible to install them (a total of 1806 blocks, 3 to 6 m long and 10 to 20 tons in weight, were made and installed), with the placing of the concrete in the formwork being carried out ahead of schedule, which greatly reduced the construction periods. This method is recommended for other large hydroelectric plants. The initiators of this advanced construction technique obtained the required accuracy in the preparation of the blocks.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature Cited

  1. A. M. Startsev, “Radial gates for closing the low-level outlets at the Krasnoyarsk hydroelectric plant and experience with their operation,” Transactions of Coordinating Conferences on Hydraulic Engineering [in Russian], No. 62, Leningrad (1971).

  2. G. A. Polonskii, “Construction of the penstocks for the Krasnoyarsk hydroelectric plant,” Gidrotekh Stroitel'., No. 6 (1969).

  3. A. M. Startsev, “Rational selection of the gates for spillways in large reservoirs,” Énergeticheskoe Stroitel'., No. 7 (1965).

  4. G. A. Polonskii, “Mechanical equipment for the Krasnoyarsk hydroelectric plant and its erection,” Gidrotekh. Stroitel'., No. 7 (1970).

  5. D. M. Savin, “Prepararation and erection of the concrete slot members for the Krasnoyarsk hydroelectric plant,” Énergeticheskoe Stroitel'stvo, No. 8 (1969).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 24–29, September, 1972.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Savin, D.M. Mechanical equipment at the Krasnoyarsk hydroelectric plant. Hydrotechnical Construction 6, 854–861 (1972). https://doi.org/10.1007/BF02377855

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02377855

Keywords

Navigation