Hydrotechnical Construction

, Volume 6, Issue 9, pp 833–841 | Cite as

Full-scale observations and investigations of structures of the Krasnoyarsk hydro development during construction and operation

  • V. V. Blinkov
  • A. P. Epifanov
  • V. A. Koren'kov
  • V. E. Lyapin
  • M. F. Skladnev
  • A. G. Solov'eva
  • É. K. Aleksandrovskaya
  • L. M. Garkun
  • Yu. A. Grigor'ev
  • N. A. Eliseev
Papers
  • 24 Downloads

Keywords

Energy Source Power Generation Power Engineer Renewable Energy Source Structural Foundation 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literature Cited

  1. 1.
    A. I. Kuznetsov and G. F. Avrova, “Evolution of the bed of the Enisei River, at the construction site reach of the Krasnoyarsk kydroelectric station,” No. 12 (1963).Google Scholar
  2. 2.
    A. G. Solov'eva, Transactions of the Joint Conference on Hydraulic Engineering [in Russian], No. 52. Énergiya (1969).Google Scholar
  3. 3.
    S. I. Korol', “Organization of the foundation pit area at the, construction of the Krasnoyarsk hydroelectric station,” No. 11 (1968).Google Scholar
  4. 4.
    A. E. Bochkin, E. E. Liskun, V. A. Koren'kov, G. A. Ozolin, and S. I. Korol', “Temporary retention of the ice drift in fron of the Krasnoyarsk hydroelectric station, structure,” No. 4 (1968).Google Scholar
  5. 5.
    V. A. Koren'kov, “Results of full-scale observations of passage of ice past the Kransoyarsk hydroelectric station structures,” No. 7 (1970).Google Scholar
  6. 6.
    A. G. Solov'eva, Collection of Annotations of Works Completed in 1966 [in Russian],Google Scholar
  7. 7.
    A. A. Ivoilov and N. A. Eliseev, “Full-scale investigations of hydrostatic pressure fluctuations in the temporary discharge conduit of the Krasnoyarsk hydroelectric station,” in: Collection of Works Completed in 1968 [in Russian], Énergiya (1969).Google Scholar
  8. 8.
    N. A. Eliseev and A. M. Shvainshtein, “Some results of measuring the flow rate of air in the deep conduits of the Krasnoyarsk hydroelectric station,” in: Transactions of the Joint Conference on Hydraulic Engineering [in Russian], No. 62, Énergiya (1971).Google Scholar
  9. 9.
    A. S. Kirpichev and V. E. Lyapin, “Full-scale investigations of local scouring of the rock channel in the lower spillway pool of the Krasnoyarsk hydroelectric station,” in: Transactions of the Joint Conference on Hydraulic Engineering [in Russian], No. 52, Énergiya (1969).Google Scholar
  10. 10.
    A. G. Solov'eva, Izvestiya VNIIG,88, (1969).Google Scholar
  11. 11.
    É. K. Aleksandrovskaya, “Plan of full-scale investigations of the Krasnoyarsk hydroelectric station dam,” in: Transactions of the Joint Conference on Hydraulic Engineering [in Russian], No. 19 (1965).Google Scholar
  12. 12.
    Ts. G. Ginzburg and A. P. Epifanov, “Heat liberation of cement in concrete,” No. 1 (1966).Google Scholar
  13. 13.
    A. P. Epifanov, “Use of pipe cooling for regulating the temperature regime of the Krasnoyarsk hydroelectric station,” Énergeticheskoe Stroitel'stvo, No. 6 (1965).Google Scholar
  14. 14.
    A. P. Epifanov and I. A. Petrova “Requirements imposed on the temperature regime of massive columnsectioned blocks poured on a concrete foundation of different age,” No. 8 (1967).Google Scholar
  15. 15.
    L. M. Garkun, A. P. Dolmatov, and A. P. Epifanov, “Full-scale investigations of the conditions of occurrence of surface cracks in the massive concrete blocks of the Krasnoyarsk hydro development,” in: Transactions of the Joint Conference on Hydraulic Engineering [in Russian], No. 49 (1969).Google Scholar
  16. 16.
    V. V. Blinkov and Yu. N. Gusev, “Full-scale investigations of the crack resistance of experimental long concrete blocks of the Krasnoyarsk hydroelectric station dam,” Izvestiya VNIIG,84 (1967).Google Scholar
  17. 17.
    É. K. Aleksandrovskaya, “Stresses in the Krasnoyarsk hydroelectric station dam during the construction and temporary operating periods,” No. 4 (1971).Google Scholar
  18. 18.
    É. K. Aleksandrovskaya and V. P. Urakhchin, “Analysis of horizontal displacements of the Krasnoyarsk dam crest a ccording to the data of full-scale observations,” Izvestiaya VNIIG,99 (1972).Google Scholar
  19. 19.
    V. V. Blinkov, Yu. N. Gisev, and É. K. Aleksandrovskaya, “Results of full-scale observations of stresses in the Krasnoyarsk hydroelectric station penstock,” No. 4 (1971).Google Scholar
  20. 20.
    É. K. Aleksandrovskaya and N. A. Kadyskina, “Determination of the coefficients of temperature diffisivity and linear expansion of the Krasnoyarsk dam concrete a ccording to data of full-scale observation,” Énergeticheskoe Stroitel'stvo, No. 7 (1971).Google Scholar
  21. 21.
    A. P. Epifanov, L. M. Garkun, and A. P. Dolmatov, “Determination of maximum expansibility of concrete under natural construction conditions of the Krasnoyarsk hydroelectric station,” in: Collection of Reports on Winter Concreting [in Russian], Krasnoyarsk (1967).Google Scholar

Copyright information

© American Society of Civil Engineers 1973

Authors and Affiliations

  • V. V. Blinkov
  • A. P. Epifanov
  • V. A. Koren'kov
  • V. E. Lyapin
  • M. F. Skladnev
  • A. G. Solov'eva
  • É. K. Aleksandrovskaya
  • L. M. Garkun
  • Yu. A. Grigor'ev
  • N. A. Eliseev

There are no affiliations available

Personalised recommendations