Skip to main content
Log in

Adequacy of the capacity of hydroelectric plants in large power systems

  • Discussions
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. Transactions of the 2nd All-Union Scientific-Research Conference on Stability and Reliability of Power Systems in the USSR [in Russian], Énergiya (1969).

  2. B. É. Kazantsev and A. V. Slautina, “Evaluation of the reliability of power supply in a combined power system”, Izvestiya Vuzov, Énergetika, No. 10 (1970).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 45–47, April, 1972.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kazantsev, B.É., Shchavelev, D.S. Adequacy of the capacity of hydroelectric plants in large power systems. Hydrotechnical Construction 6, 383–386 (1972). https://doi.org/10.1007/BF02377551

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02377551

Keywords

Navigation