Conclusions
-
1.
The quality of the concrete at the Vlotslavek hydraulic development was satisfactory. A characteristic aspect was the use of a smaller quantity of cement than at other hydraulic projects in Poland, as for example, the Solina project, where, as is known, a large gravity dam was built.
-
2.
The strength and density indices of the investigated concrete samples were high; thanks to the use of highfrequency vibrators, the constructional concrete had a strength which was 10–15% higher than that stipulated in the project. project.
-
3.
The experience gained with the concreting work will permit the construction of high-quality and less expensive structures at the projects now being constructed or designed in Poland.
Similar content being viewed by others
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 51–53, July, 1973.
Rights and permissions
About this article
Cite this article
Ladyzhyn'ski, K., Banashek, E. Concreting operations at the Vlotslavek hydraulic development on the Vistula River. Hydrotechnical Construction 7, 692–695 (1973). https://doi.org/10.1007/BF02377266
Issue Date:
DOI: https://doi.org/10.1007/BF02377266