Conclusions

  1. 1.

    A comprehensive analysis of the results of control of the state of the concrete structures at the V. I. Lenin Plyavinsk hydroelectric plant indicates that they are in satisfactory condition.

  2. 2.

    The seepage conditions of the structures should not cause any alarm concerning their stability. In most of the structures the characteristics of the seepage regine did not reach the design values.

  3. 3.

    The downstream drainage system did not fulfill completely the function for which it had been designed. The pressure in this system amounted to only 20% of the design pressure.

  4. 4.

    The settlements and displacements of the powerhouse have not yet been stabilized. Settlements of the right block are 50% lower than the design values, while those of the left block are 8.5% higher.

  5. 5.

    In most of the elements the stresses in the reinforcement did not reach design values.

  6. 6.

    At unique hydraulic structures, full-scale observations should be conducted from the beginning of construction: during the initial period they should be carried out jointly by personnel from the design and operating organizations, and approximately 1.5 years before inundation of the structures or placing the first units into operation, all observations on the structures should be transferred to the operating personnel. During construction, serious attention should be given to the adequate and high-quality installation of the control-measuring devices.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature Cited

  1. G. V. Rubinshtein and G. B. Sandomirskii, “Scheme for utilization of the Daugav River,” Gidrotekh. Stroitel'., No. 12 (1963).

  2. G. V. Rubinshtein and G. B. Sandomirskii, “Plyavinsk hydroelectric station on the Daugav River, Gidrotekh. Stroitel'., No. 3 (1968).

  3. N. N. Pestovskii, “Engineering-geologic conditions of the construction of the Plyavin'sk hydroelectric development,” Gidrotekh. Stroitel'., No. 2 (1970).

  4. A. D. Taukach, V. I. Lenin Plyavinsk hydroelectric station in the Latvian SSR and its operation,” Gidrotekh. Stroitel'., No. 2 (1970).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 12, pp. 11–16, December, 1972.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Knok, Y.F., Rogal, M.F. & Belova, V.I. Control of the state of the structures at the V. I. Lenin Plyavinsk hydroelectric plant (Latvian SSR). Hydrotechnical Construction 6, 1139–1146 (1972). https://doi.org/10.1007/BF02377018

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02377018

Keywords

Navigation