Skip to main content
Log in

Methods for improving the construction of prefabricated large-block reinforced concrete hydroelectric station buildings

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. V. N. Rudakov, “The Saratov hydroelectric station constructed from prefabricated reinforced concrete,” Gidrotekh. Stroitel'., No. 2 (1961).

  2. A. K. Vakhrameev, V. N. Rudakov, and L. V. Baikova, “Experience in the design of the Saratov hydroelectric station building from prefabricated reinforced concrete,” Gidrotekh. Stroitel'., No. 4 (1966).

  3. D. A. Butaev, I. S. Rozenberg and V. M. Semenkov, “Hydraulic-turbine funnel draft tubes,” Gidrotekh. Stroitel'., No. 3 (1965).

  4. A. F. Gubin, Problems of Hydraulics of the Turbine Units of Multipurpose Hydroelectric Stations with Funnel Draft Tubes [in Russian], Author Abstract, Moskovskii Gidromeliorativnyi Institutut (1967).

Download references

Authors

Additional information

From project and construction experience on the Saratov hydroelectric station.

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 11, pp. 17–20, November, 1968.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Rudakov, V.N. Methods for improving the construction of prefabricated large-block reinforced concrete hydroelectric station buildings. Hydrotechnical Construction 2, 972–976 (1968). https://doi.org/10.1007/BF02376686

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02376686

Keywords

Navigation