Skip to main content
Log in

Discussion on building codes

Model tests for determining the minimum depth of embedment for concrete-lined hydraulic pressure tunnels

  • Papers
  • Discussion
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. P. S. Lomaya, Remarks on “Specifications for the Design of Hydraulic Tunnels, Building Code SN238-63,” Gidrotekhnicheskoe Stroitel'stvo, No. 5 (1965).

  2. Ch. Eger, “Recent Investigations on Underground Construction in England and the Mechanics of Weathered Media,” VII International Congress on Large Dams, Rome (1961).

  3. S. G. Gutman, “Regarding the Design of Tunnels,” Bulletin of the VNNIG,25, 1939.

  4. Zh. Talobr, Rock Mechanics, Gosgortekhizdat (1960).

Download references

Authors

Additional information

Translated from Gidroteckhnicheskoe Stroitelstvo, No. 3, pp. 45–50, March, 1970.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Éristov, V.S., Churakov, A.I. & Kalandarishvili, A.G. Discussion on building codes. Hydrotechnical Construction 4, 257–264 (1970). https://doi.org/10.1007/BF02376477

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02376477

Keywords

Navigation