Skip to main content
Log in

The Atbashi hydroelectric station

  • Papers
  • On the Centennial of V. I. Lenin's Birth
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    As indicated in the project design, it is possible to erect dams without coffer dams, excavation, and dewatering, i.e., without excavating the river bed alluvium on mountain streams, similar to the Atbashi River. The watertight structures in the submerged section of the dam can be made by cementation of the alluvium and core of the dam.

  2. 2.

    When the stream has a large silt burden, which will rapidly silt a canyon reservoir, it can be used as a settling pond with periodic annual deep flushing. The system of operating the reservoir which has been adopted eliminates the necessity for constructing the ordinary type of settling ponds, which is impossible or very difficult in canyon stream beds.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 3, pp. 9–14, March, 1970.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zinevich, N.I., Sakharov, I.N. & Nikitenkov, A.F. The Atbashi hydroelectric station. Hydrotechnical Construction 4, 206–212 (1970). https://doi.org/10.1007/BF02376467

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02376467

Keywords

Navigation