Rights and permissions
About this article
Cite this article
Conversion of approved estimates for the construction of hydroelectric stations. Hydrotechnical Construction 2, 912–916 (1968). https://doi.org/10.1007/BF02376329
Issue Date:
DOI: https://doi.org/10.1007/BF02376329