Skip to main content
Log in

Construction of the Kuban’-Kalaus hydroelectric plants

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotechnicheskoe Stroitel’stvo, No. 2, pp. 5–12, February, 1968.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Vinnichek, A.N. Construction of the Kuban’-Kalaus hydroelectric plants. Hydrotechnical Construction 2, 94–103 (1968). https://doi.org/10.1007/BF02376274

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02376274

Keywords

Navigation