  1. 1.

    The problem of optimizing the initial filling regime of large multiannual regulation reservoirs is a part of the general problem of optimizing the operation of a hydroelectric plant in a power system.

  2. 2.

    The optimization of the initial reservoir filling regime is possible by using one of the dynamic programming algorithms, which enables solving the problem for minimum power system computed expenses, taking into account also the requirements of the non-power participants in the water management complex.

  3. 3.

    The non-linearity of the relationships between energy output, power system expenses, and corresponding variation in reservoir storage volumes, determines the advisability of using dynamic programming in solving this problem.

  4. 4.

    The possible solutions of the dynamic programming equations are included within a zone whose limits, for the given river inflow conditions, are determined by the power system development characteristics, the hydroelectric plant operation rule curves for the zone of high reservoir levels, the avoidance of spillage under conditions of higher than average river flow, and the requirements of the non-power participants in the water management complex.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature Cited

  1. R. Bellman, Dynamic Programming [Russian translation], Izd-vo Inostrannoi Literatury (1960).

  2. R. Bellman and S. Dreyfus, Applied Problems of Dynamic Programming [Russian translation], Izd-vo “Nauka” (1965).

  3. S. N. Kritskii and M. F. Menkel', Water Management Computations [in Russian], Gidrometeoizdat (1952).

  4. A. Sh. Rezinkovskii and M. I. Rubinshtein, “The computation of the dynamic development of a power system for hydroelectric calculations” Izv. Acad. Nauk SSSR, Seriya “Energetika i Transport” No. 1 (1966).

  5. M. P. Feldman, A. L. Velikanov, and D. N. Korobova, “The utilization of the dynamic programming method for determining the optimum power of a group of hydroelectric plants,” in: Computational Techniques Utilization in Electrotechnics [in Russian], Part Two (1964).

  6. E. V. Tsvetkov, “Algorithm for solving on the digital computer three optimizations in time power problems,” Izv. Akad. Nauk SSSR, OTN, Seriya “Énergetika i Avtomatika,” No. 1 (1962).

  7. E. V. Tsvetkov, “Probabilistic method of establishing optimum regimes of power systems with hydroelectric plants with multiannual regulation,” Trudy VNIIÉ,13, Gosénergoizdat (1961).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 35–38, May, 1968.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Korobova, D.N. Optimization by dynamic programming of hydroelectric plant operation regime during initial filling period of multiannual regulation reservoir. Hydrotechnical Construction 2, 421–425 (1968). https://doi.org/10.1007/BF02376113

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02376113

Keywords

Navigation