Skip to main content
Log in

Hydroelectric station on the Mamakan river

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature Cited

  1. V. I. Teleshev, M. I. Pinigin, and M. V. Tolokno, “Passing the spring ice flow through structures of the Mamakansk HES,” Gidrotekh. Stroitel'., No. 7 (1961).

  2. A. V. Shvetsov and V. I. Teleshev, “Selection of Mamakansk HES dam profile,” Bulletin of Scientific-Technical Information, Gidroproekta, No. 6 (1959).

  3. V. I. Teleshev, “Further lightening of the Mamakansk HES dam profile,” Informatsionnyi Sbornik Lengidroproekta, No. 21 (1961).

  4. N. G. Semenov, “Hydroelectric station on the Mamakan River,” Trudy Lengidroproekta, No. 1 (1965).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 1–4, May, 1968.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Teleshev, V.I., Semenov, N.G. Hydroelectric station on the Mamakan river. Hydrotechnical Construction 2, 374–378 (1968). https://doi.org/10.1007/BF02376105

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02376105

Keywords

Navigation