Skip to main content
Log in

Method for estimating the inspection schedule for potentially hazardous equipment

  • Industrial Ecology
  • Industrial Safety of Equipment and Production
  • Published:
Chemical and Petroleum Engineering Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

References

  1. J. J. Buckly, “Risk analysis and risk management: As historical perspective,”Risk Analysis,5, No. 4, 303–313 (1985).

    Google Scholar 

  2. M. M. Grunina, “Development of safety systems for the process of filling tanks with acetylene,” Dissertation in competition for the academic degree of Candidate of Technical Sciences (1993).

  3. R. B. Keey, “The use of hazard-warning analysis,”Chem. Eng. Process, No. 20, 289 (1986).

    Article  CAS  Google Scholar 

  4. V. C. Marshall,Major Chemical Hazards [Russian translation], Mir, Moscow (1989).

    Google Scholar 

  5. B. G. Popov and M. M. Grunina, “Estimating the inspection schedule for acetylene tanks,”Khim. Prom., No. 4, 57–60 (1994).

    Google Scholar 

  6. B. G. Popov, “Analysis of the explosion safety of production equipment,”Bezopasnost' Truda v Promyshlennosti, No. 1, 35–37 (1998).

    Google Scholar 

  7. GOST 12.1.004-91, “Fire safety. General requirements.”

Download references

Authors

Additional information

All-Russian Scientific-Research Institute of Independent Metal Processing (VNIIavtogenmash). Translated from Khimicheskoe i Neftegazovoe Mashinostroenie, No. 6, pp. 38–40, June, 1999.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Grunina, M.M. Method for estimating the inspection schedule for potentially hazardous equipment. Chem Petrol Eng 35, 340–343 (1999). https://doi.org/10.1007/BF02361049

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02361049

Keywords

Navigation