Conclusions

  1. 1.

    At existing hydroelectric plants it is essential to carry out not only equipment repairs, with replacement of the rapidly wearing subassemblies, but also reconstruction work, including major jobs, which will improve quality indexes to meet modern demands on the operation of power systems and to ensure prolonged reliable equipment operation. At the same time there should be careful inspection and study of the maintenance documentation and the condition of the equipment.

  2. 2.

    Equipment reconstruction should be carried out as a combined project, bearing in mind that unreliable performance of any particular subassembly leads to unreliable operation of the whole turbogenerator.

  3. 3.

    In resolving the question of equipment reconstruction, it is essential to take into account the real prospects of long-term operation of the structures and equipment, not only under design conditions but also with the possible changes in such conditions.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. Papers on the Construction of Svir Hydroelectric Installations [in Russian], in: Collection Under Editorship of G. O. Graftio, Issues IX and X (1936).

  2. V. I. Dmitrevskii, Hydrotechnical Structures at the Lower Svir Hydroelectric Installation (Svir III), Svir'stroi (1934).

  3. S. A. Kazarov and N. A. Radchenko, “Summary of 40-Year Operation of the G. O. Graftio Lower Svir' Hydroelectric Station,” Gidrotekh. Stroit., No. 2 (1974).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 10, pp. 22–23, October, 1978.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Rubtsov, V.V. Modernization and reconstruction of the main plant of Lower Svir hydroelectric station. Hydrotechnical Construction 12, 998–1001 (1978). https://doi.org/10.1007/BF02352787

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02352787

Keywords

Navigation