Skip to main content
Log in

Progressive technical solutions used during construction of the Ust-Ilim hydroelectric plant

  • Paper
  • At the Construction Projects of the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 9, pp. 5–8, September, 1978.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kozyarskii, Y.K. Progressive technical solutions used during construction of the Ust-Ilim hydroelectric plant. Hydrotechnical Construction 12, 864–868 (1978). https://doi.org/10.1007/BF02322081

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02322081

Keywords

Navigation