Skip to main content
Log in

Construction of the sequence of the Selrein-Ziltz high-head pumped-storage system

  • Papers
  • In the Soviet National Committee on Large Dams
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Compiled from the prospectus “The Selrein-Ziltz Sequence of Hydrostations,” Innsbruck (1977).

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 3, pp. 37–40, March 1979.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Borovoi, A.A., Mikhailov, L.P., Kuperman, V.L. et al. Construction of the sequence of the Selrein-Ziltz high-head pumped-storage system. Hydrotechnical Construction 13, 275–279 (1979). https://doi.org/10.1007/BF02308024

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02308024

Keywords

Navigation