Advertisement

Hydrotechnical Construction

, Volume 13, Issue 2, pp 139–144 | Cite as

From the construction experience at the Nurek hydroelectric station

  • P. P. Listrovoi
  • A. D. Semenikhin
Papers At Construction Projects of the Five-Year Plan
  • 19 Downloads

Keywords

Energy Source Power Generation Power Engineer Renewable Energy Source Structural Foundation 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literature cited

  1. 1.
    V. F. Ilyushin, “Advanced design solutions for the underground structures at the Nurek hydroelectric station, Gidrotekh. Stroit., No. 3 (1977).Google Scholar
  2. 2.
    B. M. Pokrovskii et al., “Regulation of the hydraulis units of the Nurek hydroelectric station without surge shafts on the headrace tunnels,” Gidrotekh. Stroit., No. 11 (1971).Google Scholar

Copyright information

© Plenum Publishing Corporation 1979

Authors and Affiliations

  • P. P. Listrovoi
  • A. D. Semenikhin

There are no affiliations available

Personalised recommendations