Skip to main content
Log in

New electric plant and progressive electrical designs at the Sayano-Shushenskoe hydropower station

  • Papers
  • At Construction Projects of the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 2, pp. 17–20, February, 1979.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Yakovlev, O.I., Tikhodeev, N.N., Tarasov, V.K. et al. New electric plant and progressive electrical designs at the Sayano-Shushenskoe hydropower station. Hydrotechnical Construction 13, 130–136 (1979). https://doi.org/10.1007/BF02307502

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02307502

Keywords

Navigation