Investigation of construction-joint grouting techniques under field conditions

  • Papers
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    For preliminary assessments of the standard of joint grouting, use can be made of the results of expanded water testing, with the air outlet closed and open, respectively. In analyzing the water-test results, it is convenient to examine the grouting networks by dividing them into two groups according to their hydraulic penetrability: those which meet, and those that do not meet, the requirements stated in the Technical Standards (TS) for grouting joints.

  2. 2.

    The consumption of water in grouting networks, obtained when water testing with the air outlet closed, does not determine the watertightness of the peripheral seal installed for grouting purposes. In our opinion, the grouting network can be regarded as watertight provided the condition is met whereby the discharge diminishes and rises with the corresponding injection pressure.

  3. 3.

    An analysis of water-test results, conducted on 79 grouting networks of intercolumnar joints of the dam of the Sayano-Shushenskoe hydropower scheme, indicates a sufficiently satisfactory standard of installation of the embedded grouting fittings, the watertight design of the grouting network, and of smooth surfaces of the construction joints. This is verified by the close values of the pressures at the inlet and outlet of the grouting network and of the supplementary displacements of the joints, which develop even at low injection pressures.

  4. 4.

    The analysis carried out on the supplementary opening of construction joints during water testing, grouting, and the post-grouting period (2 h after the work has been completed), indicates that the most favorable grouting technology has been maintained. The technique is verified as the means for the successful monolithization of the dam section.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. G. M. Makedonskii, B. P. Matveev, G. K. Sukhanov, et al., Dissection of Mass Concrete Structures into Concreting Beams [in Russian], Énergiya, Moscow (1969).

    Google Scholar 

  2. V. N. Zhivoderov, “Measures for raising standard of grouting of intercolumnar joints of Krasnoyarsk Hydropower Scheme dam,” Eksp.-Inf., “Construction of Hydroelectric Power Stations” series, Informénergo, No. 3, Moscow (1971).

    Google Scholar 

  3. V. A. Portnov, A. V. Sklyarenko, V. S. Denisov, et al., “Construction of Chirkey hydroelectric scheme,” Energ. Stroit., No. 10 (1977)

  4. A. E. Bochkin, Yu. A. Grigor'ev, E. A. Dolginin, and Yu. E. Apollonov, Concrete Work in the Construction of the 50th Anniversary of the USSR Krasnoyarsk Hydropower Plant [in Russian], Stroiizdat, Moscow (1977).

    Google Scholar 

  5. G. L. Kaidanov, B. G. Fomin, and F. B. Freidman, “Creation of conditions for opening the intercolumnar joints and the monolithization of the Ust-Ilim hydropower plant dam,” Energ. Stroit., No. 3 (1976).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 18–22, September, 1979.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zhivoderov, V.N., Sukhanov, G.K. Investigation of construction-joint grouting techniques under field conditions. Hydrotechnical Construction 13, 872–879 (1979). https://doi.org/10.1007/BF02307458

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02307458

Keywords

Navigation