Practical use the results of on-site investigations and safety inspection of hydraulic structures

  • V. S. Kuznetsov
  • A. I. Tsarev
Papers Experience with Operation of Hydraulic Structures and Equipment of Hydroelectric Plants
  • 18 Downloads

Keywords

Energy Source Power Generation Power Engineer Renewable Energy Source Structural Foundation 
These keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literature cited

  1. 1.
    G. G. Korolev and E. L. Budnikov, “Temperature regime and formation of cracks in the concrete blocks of the Mamakan dam,” Gidrotekh. Stroit., No. 6 (1968).Google Scholar
  2. 2.
    P. I. Vasil'ev, L. M. Garkun, A. P. Epifanov, et al., “Generalization of the results of on-site investigations of the temperature regime and cracking in concrete dams of Siberia,” in: Transactions of the Joint Conferences on Hydraulic Engineering [in Russian], No. 103, Énergiya, Leningrad (1975).Google Scholar
  3. 3.
    L. M. Garkun and B. V. Shaikin, “Measures to be taken to regulate the temperature regime of concrete blocks of dams being constructed in Siberia,” Gidrotekh. Stroit., No. 6 (1978).Google Scholar
  4. 4.
    L. M. Garkun, A. P. Epifanov, V. I. Sil'nitskii, et al., “Thermal cracking in the concrete blocks of the Krasnoyarsk, Ust-Ilim, and Zeya dams,” Izv. VNIIG, Énergiya, Leningrad,107 (1975).Google Scholar
  5. 5.
    S. Ya. Eidel'man, On-Site Investigations of the Bratsk Dam [in Russian], Énergiya, Leningrad (1968).Google Scholar
  6. 6.
    S. Ya. Éidel'man and V. N. Durcheva, “Role of the temperature factor in the state of stress and strain of a gravity dam constructed in a rigorous climate,” Izv. VNIIG,125 (1978).Google Scholar
  7. 7.
    É. K. Aleksandrovskaya, “Stresses in the Krasnoyarsk dam during construction and temporary operation,” Gidrotekh. Stroit., No. 4 (1971).Google Scholar
  8. 8.
    É. K. Aleksandrovskaya and V. P. Urakhchin, Recommendations on Prediction of Extreme Displacements of the Crest of Concrete Gravity Dams During Their Operation [in Russian], P06-73/VNIIG (1974).Google Scholar
  9. 9.
    V. V. Blinkov, Yu. N. Gusev, and É. K. Aleksandrovskaya, “Results of on-site investigations of stresses in the penstock of the Krasnoyarsk hydrostation,” Gidrotekh. Stroit., No. 4 (1971).Google Scholar
  10. 10.
    A. I. Tsarev and A. I. Fel'dman, “Investigations of the static work of reinforced-concrete structures of the Plyavinyas hydrostation,” Energ. Stroit., No. 9 (1972).Google Scholar
  11. 11.
    I. S. Ronzhin, A. I. Tsarev, and Yu. K. Kotenkov, “Results of on-site observations and investigations of the Saratov hydrostation,” Tr. Gidroproekta, sb. 28 (1973).Google Scholar
  12. 12.
    A. I. Tsarev, “On-site investigations of stresses and strains in hydraulic structures,” Tr. Gidroproekta, No. 44 (1975).Google Scholar
  13. 13.
    A. I. Tsarev and A. I. Fel'dman, “Earth pressure of sand backfill of the dock structures of lock chambers,” Gidrotekh. Stroit., No. 9 (1965).Google Scholar
  14. 14.
    A. I. Tsarev, “Measurement of shear stresses at the contact of a structure with nonrock ground,” in: Transactions of the Joint Conferences on Hydraulic Engineering [in Russian], No. 29, Énergiya, Moscow (1966).Google Scholar
  15. 15.
    V. S. Kuznetsov, “On-site investigations of the lateral earth pressure on a thin steel diaphragm of a dam under conditions of plane stress and strain,” Izv. VNIIG,125 (1978).Google Scholar
  16. 16.
    Yu. E. Mirzak, M. S. Kazachenko, and A. I. Tsarev, “Temperature regime of concrete of the Toktogul dam during construction,” Energ. Stroit., No. 1 (1977).Google Scholar
  17. 17.
    L. A. Tolkachev, V. S. Shangin, et al., Instructions on the Use of the Layer-by-Layer (Toktogul) Method of Placing Concrete in Hydrotechnical Construction, VSN06-74 MÉiÉ SSSR [in Russian] (1974).Google Scholar
  18. 18.
    V. S. Kuznetsov and A. I. Liberman, “Investigations of the moraine soil of the core of the Serebryanka dam,” Gidrotekh. Stroit., No. 10 (1973).Google Scholar
  19. 19.
    V. S. Kuznetsov, “Some results of on-site observations of the dam of the No. 1 Serebryansk hydrostation,” Gidrotekh. Stroit., No. 4 (1974).Google Scholar
  20. 20.
    V. S. Kuznetsov, N. P. Shargorodskii, and N. V. Tolokno, “On-site investigations of the dams of the Serebryanka hydrostations,” Energ. Stroit., No. 4 (1979).Google Scholar
  21. 21.
    V. S. Kuznetsov, “Stressed state and horizontal displacements of a thin metal diaphragm of an earth dam (from data of on-site investigations),” Izv. VNIIG,142 (1980).Google Scholar
  22. 22.
    N. I. Chalyi, “Behavior of the Chirkey arch dam during initial filling of the reservoir,” Izv. VNIIG,125 (1978).Google Scholar

Copyright information

© Plenum Publishing Corporation 1981

Authors and Affiliations

  • V. S. Kuznetsov
  • A. I. Tsarev

There are no affiliations available

Personalised recommendations