Skip to main content
Log in

Comments on S. I. Taicher's article

  • Papers
  • Discussion of Construction Specifications
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. SNiP II-16-76. Foundations of Hydraulic Structures [in Russian], Stroiizdat, Moscow (1977).

  2. SNiP II-50-74. River Hydraulic Structures. Basic Design Principles [in Russian], Stroiizdat, Moscow (1975).

  3. A. I. Antipov, “Selection of a rational underground contour of concrete slabs on sand foundations,” Gidrotekh. Stroit., No. 10 (1959).

  4. A. I. Antipov, “Determination of the main dimensions of concrete conduits with a plane underground contour,” Gidrototekh. Stroit., No. 7 (1960).

  5. L. V. Oleshkevich, “Graph-analytic method of determining the main dimensions of a spill-way dam meeting the conditions of static stability,” Nauch. Zap MIIVKh, No. 2 (1936).

Download references

Authors

Additional information

“Comments on SNiP II-16-76 “Foundations of Hydraulic Structures,'” Gidrotekh. Stroit., No. 6 (1979).

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 6, p. 44, June, 1980.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Antipov, A.I. Comments on S. I. Taicher's article. Hydrotechnical Construction 14, 615–616 (1980). https://doi.org/10.1007/BF02305409

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02305409

Keywords

Navigation