Conclusions
-
1.
Consideration of special conditions for the passage of flows through the sluice during the current year made it possible to employ a temporary scheme for maneuvering the basic gates and to complete construction of the sluice in time for the flood due to a reduction in the volume of construction-assembly work and a shortening of construction times.
-
2.
The construction of supports for the underground working-gate unit in sectional reinforced concrete made it possible to reduce the time required for construction of the unit due to concurrent construction-assembly operations.
-
3.
The adoption of reinforced-concrete support designs in combination with anchors enabled us to deviate from the traditional method employed to build similar units using reinforced-concrete arches.
Similar content being viewed by others
Literature cited
P. P. Listrovoi and N. A. Skvortsova, “The Nurek hydro project on the Vakhsh River,” Gidrotekh. Stroit., No. 1 (1960).
V. F. Ilyushin, Underground Structures at the Nurek Hydroelectric Plant [in Russian], Informénergo, Moscow (1970).
G. A. Polonskii, “The development of gate building for hydraulic structures in the USSR,” Gidrotekh. Stroit., No. 6 (1968).
L. A. Gusakova et al., “Improving the technology of mining-tunneling and concrete operations in the process of constructing underground structures for the first stage of the Nurek hydroelectric plant,” Energ. Stroit., No. 6 (1974).
A. A. Podrechnev, “Improving construction technology for underground structures at the Nurek hydroelectric plant under complex geologic conditions,” in: A collection of material entitled “Mining and Blasting Operations in Hydraulic Construction” [in Russian], Tula (1973).
Yu. K. Sevenard et al., “Passage of Vakhsh River flows during construction of the Nurek hydroelectric plant,” Gidrotekh. Stroit., No. 7 (1979).
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 6, pp. 9–12, June, 1980.
Rights and permissions
About this article
Cite this article
Gurtovnik, F.I., Shutenkov, S.V. & Mel'nikov, A.K. Construction of a basic-gate unit for the deep catastrophic sluice at the Nurek hydroelectric plant. Hydrotechnical Construction 14, 556–560 (1980). https://doi.org/10.1007/BF02305397
Issue Date:
DOI: https://doi.org/10.1007/BF02305397