Conclusion
As compared with other projects, e.g., the underground complex at the Nurek hydroelectric plant, the progressive solutions that we adopted for the construction of the underground complex at the Rogun hydroelectric plant provided increased basic technicoeconomic indicators; this is graphically apparent from the data presented in Table 3.
According to preliminary plans for the organization of construction on the underground complex of the Rogun plant, material consumption will be reduced by 30%, labor outlays by 10%, and the quoted cost by 5%, and construction rates as per directives will be increased by 30%.
Similar content being viewed by others
Literature cited
L. G. Osadchii and R. I. Bakhtiyarov, “The Rogun hydro project on the Vakhsh River,” Gidrotekh. Stroit., No. A (1975).
Additional information
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 6, pp. 3–9, June, 1980.
Rights and permissions
About this article
Cite this article
Osadchii, L.G., Ilyushin, V.F. & Bubman, I.S. Progressive solutions in the design of underground structures for the Rogun hydroelectric plant. Hydrotechnical Construction 14, 546–555 (1980). https://doi.org/10.1007/BF02305396
Issue Date:
DOI: https://doi.org/10.1007/BF02305396