Skip to main content
Log in

Progressive solutions in the design of underground structures for the Rogun hydroelectric plant

  • Papers
  • Construction Projects of the Five-Year Period
  • Published:
Hydrotechnical Construction Aims and scope

Conclusion

As compared with other projects, e.g., the underground complex at the Nurek hydroelectric plant, the progressive solutions that we adopted for the construction of the underground complex at the Rogun hydroelectric plant provided increased basic technicoeconomic indicators; this is graphically apparent from the data presented in Table 3.

According to preliminary plans for the organization of construction on the underground complex of the Rogun plant, material consumption will be reduced by 30%, labor outlays by 10%, and the quoted cost by 5%, and construction rates as per directives will be increased by 30%.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. L. G. Osadchii and R. I. Bakhtiyarov, “The Rogun hydro project on the Vakhsh River,” Gidrotekh. Stroit., No. A (1975).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 6, pp. 3–9, June, 1980.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Osadchii, L.G., Ilyushin, V.F. & Bubman, I.S. Progressive solutions in the design of underground structures for the Rogun hydroelectric plant. Hydrotechnical Construction 14, 546–555 (1980). https://doi.org/10.1007/BF02305396

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02305396

Keywords

Navigation