Skip to main content
Log in

Combined linings of hydraulic pressure tunnels with an outside ring of precast blocks

  • Papers
  • At Construction Projects of the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. N. S. Khachatur'yan, T. V. Vereshchagina, and V. V. Matrosov, “Model investigations of the pressure tunnel of the Zelenchuk hydroelectric station,” Tr. Gidroproekta, No. 58 (1977).

  2. B. M. Vartapetov, T. V. Vereshchagina, et al., “Circular stand for testing the crack resistance of pressure-tunnel linings,” Ekspress Inf. Ser.: Stroit. Gidroelektrostantsii i Montazh Oborudovaniya, No. 3 (1979)

  3. T. A. Zatvornitskaya, S. A. Konyaeva, and B. F. Mikulovich, Cast Concretes in Hydraulic Engineering [in Russian], Énergiya, Moscow (1974).

    Google Scholar 

  4. ldWaterproofing tunnels by the ‘Sarnavac’ method,” Metrostroi, No. 4 (1972).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 12–16, May, 1980.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Vereshchagina, T.V. Combined linings of hydraulic pressure tunnels with an outside ring of precast blocks. Hydrotechnical Construction 14, 450–456 (1980). https://doi.org/10.1007/BF02305344

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02305344

Keywords

Navigation