Use of crack-resistant linings of hydraulic tunnels with consolidation grouting of the rock

  • Papers
  • At Construction Projects of the Five-Year Plan
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The use in pressure tunnels of crack-resistant prestressed structures (lining—rock) made by the method of high-pressure grouting of the rock leads to a reduction of materials consumption of the linings, decrease of seepage leaks of water from the tunnel and, as a consequence, of production losses of the hydrostation.

  2. 2.

    It is most expedient to use the indicated structures in high-pressure tunnels with circular linings with a diameter of not more than 5–6 m located in rocks in which consolidation grouting is effective.

  3. 3.

    Strict observance of the prescribed technology is necessary with mandatory group grouting of all holes in the perimeter and, as far as possible, of the whole tunnel section under the maximum possible pressure, which is determined from the condition of stability of the lining and characteristics of the injection equipment being used.

  4. 4.

    The use of such structures requires the conduction of combined (laboratory and on-site) investigations for the purpose of selecting the optimal compositions of the injection grouts and injection parameters (pressure, number and depth of holes, number of injection cycles, etc.) and evaluating the effectiveness of grouting under the given conditions from the viewpoint of creating prestressing in the lining and enclosing rock mass.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. Instructions on Designing Hydraulic Structures. SN-238-73 [in Russian] Stroiizdat, Moscow (1974).

  2. B. Kujundzic, L. Iovanovic, and Z. Radoslavievic, “Solution du revêtement d'une galerie en charge par application d'injections a haute pression,” Rapports du Denzieme Congress de la Societe Internationalede mécanique des roches, Beograd, Vol. II, Theme 4 (1970).

  3. A. I. Churakov and E. I. Zhokhov, “Model investigations of prestressing in the rock mass surrounding a tunnel,” Gidrotekh. Stroit., No. 3 (1979).

  4. P. U. Ponimatkin, “Calculation of pressure tunnels with a concrete lining and consolidation grouting with consideration of the formation of cracks in the lining and rock,” Gidrotekh. Stroit., No. 3 (1977).

  5. V. S. Éristov, “Linings of pressure tunnels with deep grouting of the rocks,” Gidrotekh. Stroit., No. 7 (1973).

  6. É. É. Allas, “Use of grouting in structural elements of linings of high-pressure hydraulic tunnels,” Gidrotekh. Stroit., No. 10 (1968).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 3, pp. 9–12, March, 1980.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zhokhov, E.I., Fedulov, A.K. Use of crack-resistant linings of hydraulic tunnels with consolidation grouting of the rock. Hydrotechnical Construction 14, 225–229 (1980). https://doi.org/10.1007/BF02305121

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02305121

Keywords

Navigation