Skip to main content
Log in

Chapter 7 Discrete and continuous resource requests

  • Part II Multiple Category Resources
  • Published:
Annals of Operations Research Aims and scope Submit manuscript

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

References

  1. Z. Bubnicki, Multilevel optimization of the complex of operations,Proc. IFAC/IFORS Workshop on Syst. Analysis (Pergamon Press, Oxford, 1977).

    Google Scholar 

  2. Z. Bubnicki, Two level optimization and control of the complex of operations,Proc. VI IFAC Congress (Pergamon Press, Oxford, 1978).

    Google Scholar 

  3. V.N. Burkov, Raspredelenie resursov kak zadača optimalnogo bystrodeistvija, Avtomat. i Telemeh. 27, No. 7 (1966).

  4. K. Rajani Kanth, Efficient heuristic algorithms for some deterministic scheduling problems with particular reference to the job-scheduling functions of an operatng system, Ph.D. thesis, Indian Institute of Science, Bangalore, 1983.

    Google Scholar 

  5. R. Słowiński and J. Węglarz, Solving the general project scheduling problem with multiple constrained resources by mathematical programming, Found. Control Engrng. 3, No. 1 (1978)29–39.

    Google Scholar 

  6. J. Węglarz, Time-optimal control of resource allocation in a complex-of-operations framework, IEEE Trans. Syst., Man, Cybern. SMC-6, No. 11 (1976)783–788.

    Google Scholar 

  7. J. Węglarz, Project scheduling with discrete and continuous resources, IEEE Trans. Syst., Man, Cybern. SMC-9, No. 10 (1979)644–650.

    Google Scholar 

  8. J. Węglarz, Multiprocessor scheduling with memory allocation — a deterministic approach, IEEE Trans. Comput. C-29, No. 8 (1980)703–710.

    Google Scholar 

  9. J. Węglarz, Project scheduling with continuously-divisible, doubly constrained resources, Mgmt. Sci. 27, No. 9 (1981)1040–1053.

    Google Scholar 

  10. J. Węglarz, Modelling & control of dynamic resource allocation project scheduling systems, in: S.G. Tzafestas (ed.),Optimisation & Control of Dynamic Operational Research Models (North-Holland, Amsterdam, 1982).

    Google Scholar 

  11. J. Węglarz, Allocating continuous, doubly constrained resources among parallel production activities to meet deadlines, R.A.I.R.O. APII (to appear).

  12. J. Węglarz, Deadline scheduling of independent jobs under continuous processing speed-resource amount functions, submitted for publication.

Download references

Rights and permissions

Reprints and permissions

About this article

Cite this article

Chapter 7 Discrete and continuous resource requests. Ann Oper Res 7, 197–226 (1986). https://doi.org/10.1007/BF02186439

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02186439

Keywords

Navigation