References
J. Carlier, Complexité des problèmes d'ordonnancement à contraintes de financement, in: P. Hansen and D. de Werra (eds.)Regards sur la Théorie des Graphes (Presses Polytechniques Romandes, Lausanne, 1980) pp. 183–186.
J. Carlier and A.H.G. Rinnooy Kan, Scheduling subject to nonrenewable resource constraints, Operations Research Letters 1, No. 2 (1982)52–55.
M. Cochand, D. de Werra and R. Słowiński, Preemptive scheduling with staircase and piecewise linear resource availability. O.R. Working Paper 85/1, Ecole Polytechnique Fédérale de Lausanne, Dép. de Mathématiques, Lausanne 1985.
S.E. Elmaghraby,Activity Networks. Project Planning and Control by Network Models (Wiley, New York, 1977).
J. Grabowski and A. Janiak, Sequencing problem with resource constraints, in: R. Trappl (ed.),Cybernetics and Systems Research 2 (North-Holland, Amsterdam, 1984) pp. 329–333.
G. Merkel, G. Nägler and S. Schönherr,Anwenderhandbuch LEINET-OS, Teil 1 (Institut für Aus- und Weiterbildung im Bauwesen, Leipzig 1980).
J. Patterson, R. Słowiński, B. Talbot and J. Węglarz, An algorithm for a general class of precedence and resource constrained scheduling problems. Submitted for publication.
S. Schönherr, The problem of allocation of storable resources to activities of a network model, Math. Operationsforsch. u. Statist., ser. optimization 15, No. 1 (1984)99–114.
R. Słowiński, Cost-minimal preemptive scheduling of independent jobs with release and due dates on open shop under resource constraints, Information Processing Letters 9, No. 5 (1979)233–237.
R. Słowiński, Algorithms for the Allocation of Resources of Different Categories in the Complex of Operations Framework (in Polish). Technical University of Poznań Press, ser. Rozprawy No. 114, Poznań, 1980.
R. Słowiński, Preemptive scheduling of independent jobs on parallel machines subject to financial constraints, European Journal of Operational Research 15, No. 3 (1984)366–373.
J.B. Stinson, E.W. Davis and B.M. Khumawala, Multiple resource-constrained scheduling using branch and bound, AIIE Transactions 10, No. 3 (1978)252–259.
F.B. Talbot, Resource-constrained project scheduling with time-resource tradeoffs — the nonpreemptive case, Management Science 28, No. 10 (1982)1197–1210.
F.B. Talbot and J.H. Patterson, An efficient integer programming algorithm with network cuts for solving resource-constrained scheduling problems, Management Science 24, No. 11 (1978)1163–1174.
Rights and permissions
About this article
Cite this article
Chapter 5 General discrete resource requests. Ann Oper Res 7, 151–176 (1986). https://doi.org/10.1007/BF02186437
Issue Date:
DOI: https://doi.org/10.1007/BF02186437