Soil Mechanics and Foundation Engineering

, Volume 14, Issue 3, pp 155–160 | Cite as

Construction of trench backfills simultaneously with preparation of bases for floors and foundations of equipment on collapsible soils

  • V. I. Krutov
From The Experience Of Construction Organizations
  • 30 Downloads

Keywords

Civil Engineer Trench Structural Foundation Hydraulic Engineer Collapsible Soil 

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Literature cited

  1. 1.
    V. I. Krutov, R. P. Éiduk, and I. F. Mukhrygin, “Selection of compaction methods for backfills at the Kama Truck Factory,” No. 6 (1975).Google Scholar
  2. 2.
    V. I. Krutov, R. P. Eiduk, V. L. Rafal'zuk, I. F. Mukhrygin, and N. A. Mandrov, “Backfill compaction at the Kama Truck Factory,” Prom. Stroit., No. 10 (1975).Google Scholar
  3. 3.
    V. N. Smirnov and V. A. Kharlamov, “Quality control of bases and backfills by means of radioisotope instruments,” Prom. Stroit., No. 4 (1975).Google Scholar
  4. 4.
    Instructions for Deep Compaction of Collapsible Soils in Bases of Buildings and Structures by Means of Earth Piles (SN 33–66) [in Russian], Stroiizdat, Moscow (1967).Google Scholar

Copyright information

© Plenum Publishing Corporation 1977

Authors and Affiliations

  • V. I. Krutov
    • 1
  1. 1.Scientific-Research Institute of FoundationsUSSR

Personalised recommendations