Skip to main content
Log in

Decision making for multiple utilization of water resources in New Zealand

  • Profile
  • Published:
Environmental Management Aims and scope Submit manuscript

Abstract

The Clutha is the largest river in New Zealand. The last two decades have witnessed major conflicts centered on the utilization of the water resources of the upper Clutha river. These conflicts have by no means been finally resolved. The focus of this article is on institutional arrangements for water resource management on the Clutha, with particular reference to the decision-making processes that have culminated in the building of the high dam. It critically evaluates recent experiences and comments on future prospects for resolving resource use conflicts rationally through planning for multiple utilization in a climate of market led policies of the present government.

The study demonstrates the inevitable conflicts that can arise within a public bureaucracy that combines dual responsibilities for policy making and operational functions. Hitherto, central government has been able to manipulate the water resource allocation process to its advantage because of a lack of clear separation between its two roles as a policy maker and developer. The conflicts that have manifested themselves during the last two decades over the Clutha should be seen as part of a wider public debate during the last two decades concerning resource utilization in New Zealand. The Clutha controversy was preceded by comparable concerns over the rising of the level of Lake Manapouri during the 1960s and has been followed by the debate over the “think big” resource development projects during the 1980s.

The election of the fourth Labour government in 1983 has heralded a political and economic policy shift in New Zealand towards minimizing the role of public intervention in resource allocation and major structural reforms in the relative roles of central and regional government in resource management. The significance of these changes pose important implications for the future management of the Clutha.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  • Atkinson, R. 1982. Upper Clutha hydro schemes. Environment Defence Society, Auckland, New Zealand.

    Google Scholar 

  • Annan vs NWSCA. 1980. 7 N.Z. Town Planning Appeals: 417.

  • Annan vs NWSCA. and Minister of Energy. 1982. 8 N.Z. Town Planning Appeals: 369.

  • Brookfield, F. M. 1983. High courts, high dam, high policy: The Clutha River and the constitution.Recent Law March:62–72.

    Google Scholar 

  • Coper, M. 1983. The Franklin Dam case. Butterworths, Sydney.

    Google Scholar 

  • Clutha Valley Advisory Committee. 1976. Report of the Clutha Valley advisory committee. Ministry of Works and Development, Wellington, New Zealand.

    Google Scholar 

  • Clutha Valley Development Commission. 1974a. Interim report of the Clutha Valley development commission. Ministry of Works and Development, Wellington, New Zealand.

    Google Scholar 

  • Clutha Valley Development Commission. 1974b. Final report of the Clutha Valley development commission, Vols. 1 and 2. Ministry of Works and Development, Wellington, New Zealand.

    Google Scholar 

  • Commission for the Environment. 1975. Upper Clutha Valley development environment impact report. Government Printer, Wellington, New Zealand.

    Google Scholar 

  • Gilmore vs NWSCA and Minister for Energy. 1982. 8 N.Z. Town Planning Appeals: 298.

  • Interdepartmental Committee on Water. 1965. N.Z. law and administration in respect of water. Ministry of Works, Wellington, New Zealand.

    Google Scholar 

  • Interdepartmental Committee. 1972. The effects of hydroelectric power development on the resources of the Clutha Valley. Report to the commissioner of works. Government Printer, Wellington, New Zealand.

    Google Scholar 

  • Kellow, A. 1986. Electricity planning in Tasmania and New Zealand: Political processes and technological imperative.Australian Journal of Public Administration March:2–17.

    Google Scholar 

  • Lister, R. G. 1975. Social effects of the Upper Clutha power scheme.Journal of Hydrology (New Zealand) 14(2): 105–110.

    Google Scholar 

  • Lister, R. G. 1980. The Clutha Valley: Multiple use and problems of choice. Pages 175–191in A. G. Anderson (ed.), The land our future. Longman Paul, Auckland, New Zealand.

    Google Scholar 

  • Lonie, I. M. 1984. A history of water resource management in the Clutha River. Otago Catchment Board and Regional Water Board, Dunedin, New Zealand.

    Google Scholar 

  • Mark, A. F. 1989. Manapouri-Te Anau Hydro-Electric Development: A Case Study of its History from Conflict to Resolution. Proceedings of the Ecopolitics III Conference, University of Waikato, Hamilton.

    Google Scholar 

  • Mercer, D. 1985. Australia's constitution, federalism and the Tasmanian Dam case.Political Geography Quarterly 4(2):91–110.

    Google Scholar 

  • Mercer, D. 1986. Institutional and counter-institutional forces in Australian environmental decision-making. Working paper No. 21, Department of Geography. Monash University, Clayton, Victoria, Australia.

    Google Scholar 

  • Ministry of Works and Development. 1975. Upper Clutha Valley development environment impact report. Government Printer, Wellington, New Zealand.

    Google Scholar 

  • Ministry of Works and Development. 1986. Comprehensive report on HEP development possibilities in the Lower Clutha River. Ministry of Works and Development, Wellington, New Zealand.

    Google Scholar 

  • National Business Review. 1987. November 19.

  • National Water and Soil Conservation Organisation. 1977. Report and decision of the National Water and Soil Conservation Authority on the water right applications by the minister for electricity for the DG3 dam, at Clyde. NWASCO, Wellington, New Zealand.

    Google Scholar 

  • Otago Catchment Board. 1977. Applications for water rights for DG3, Clutha River, Clyde. Report and recommendations. Otago Catchment Board, Dunedin, New Zealand.

    Google Scholar 

  • O'Connor, K. F. 1972. Planning for recreation among other uses of mountain land and water resources.Review of the Tussock Grasslands and Mountain Lands Institute 24:26–41.

    Google Scholar 

  • O'Connor, K. F. 1975. Multiple resource use in the Upper Clutha Valley.Journal of Hydrology (New Zealand) 14(2): 130–145.

    Google Scholar 

  • Otago Daily Times. 1972. March 30.

  • Sornarajah, M. (ed.). 1983. The south west dam dispute: The legal and political issues. University of Tasmania, Hobart, Australia.

    Google Scholar 

  • White, G. F. 1969. Strategies of American water management. University of Michigan Press, Ann Arbor, Michigan.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Memon, P.A. Decision making for multiple utilization of water resources in New Zealand. Environmental Management 13, 553–562 (1989). https://doi.org/10.1007/BF01874961

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01874961

Key words

Navigation