Skip to main content
Log in

Pile driving by jacking under reconstruction conditions

  • Reconstruction In Action
  • Published:
Soil Mechanics and Foundation Engineering Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. V. S. Pushkarevich, A. I. Mel'nikov, S. M. Yablonskii, V. I. Butenko, G. D. Litvinchuk, and K. S. Chernyi, Inventor's Certificate No. 789649, MK I3, EO2D, 7/20, "Method of construction of pile foundations," Otkrytiya, Izobret., No. 47, 130 (1980).

  2. V. I. Efremenko, V. S. Pushkarevich, D. A. Romanov, V. P. Udovichenko, and V. V. Khokhol, Inventor's Certificate No. 633986, MK I3, EO2D, 7/20, "Method of construction of pile foundations," Otkrytiya, Izobret., No. 43, 103 (1978).

Download references

Authors

Additional information

UkrPTKIgidrospetsstroi. Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 2, pp. 9–11, March–April, 1987.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Novikov, M.F., Pushkarevich, V.S. Pile driving by jacking under reconstruction conditions. Soil Mech Found Eng 24, 55–58 (1987). https://doi.org/10.1007/BF01786653

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01786653

Keywords

Navigation