Skip to main content
Log in

Construction of the underground rooms of continuous steel casting units by the open caisson method (from the seminar on foundation engineering at the exhibition of achievements of the national economy)

  • From The Experience Of Construction Organizations
  • Published:
Soil Mechanics and Foundation Engineering Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Osnovaniya, Fundamenty i Mekhanika Gruntov, No. 3, pp. 18–21, May–June, 1965

Rights and permissions

Reprints and permissions

About this article

Cite this article

Salamov, K.P., Bernar, D.N. & Korsunskii, E.V. Construction of the underground rooms of continuous steel casting units by the open caisson method (from the seminar on foundation engineering at the exhibition of achievements of the national economy). Soil Mech Found Eng 2, 167–171 (1965). https://doi.org/10.1007/BF01703697

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01703697

Keywords

Navigation