Skip to main content
Log in

Realization of an algorithm for constructing an optimal schedule with a start point in a given interval

  • Published:
Journal of Soviet Mathematics Aims and scope Submit manuscript

Abstract

A system Is developed for the representation of a problem's input data and of the operational information, ensuring the achievement of the theoretically obtained estimate of the convergence of an algorithm for finding an optimal schedule starting in a prescribed interval.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. K. V. Shakhbazyan and N. B. Lebedinskaya, “On optimal schedules with interruptions for the independent jobs in a servicing system with N devices,” Zap. Nauchn. Sem. Leningr. Otd. Mat. Inst.,70, 205–231 (1977).

    Google Scholar 

  2. K. V. Shakhbazyan, “Ordering the structural set of jobs, minimizing the total penalty,” J. Sov. Math.,20, No. 2 (1982).

Download references

Authors

Additional information

Translated from Zaplski Nauchnykh Seminarov Leningradskogo Otdeleniya Matematicheskogo Instituta im. V. A. Steklova AN SSSR, Vol. 90, pp. 194–209, 1979.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Safonova, T.E. Realization of an algorithm for constructing an optimal schedule with a start point in a given interval. J Math Sci 20, 2043–2054 (1982). https://doi.org/10.1007/BF01680569

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01680569

Keywords

Navigation