Skip to main content
Log in

A rule-based robot scheduling system for flexible manufacturing cells

  • Papers
  • Published:
Journal of Intelligent Manufacturing Aims and scope Submit manuscript

Abstract

In this research we examine a class of flexible manufacturing cells (FMC) containing a robot. The role of the robot is to load parts onto machines, to unload parts from machines, and to transport parts between machines. Since the productivity of an FMC is directly proportional to the level of productive work performed by the robot, the manner in which robots move between machines affects productivity. The problem of finding efficient robot schedules/tours is therefore one of substantial economic significance in the operation of a FMC. Unfortunately, in many practical situations it is difficult to develop efficient robot schedules given the dynamic environments in which they exist. We devise a rule-based system to assist the cell supervisor in making good decisions by dynamically coordinating the available information during the production process. The rule-based system combines an algorithmic procedure to deal with a well-structured environment and a flexible heuristic approach employed to deal with less well-structured environments. Both the algorithmic and heuristic procedures are applied separately, then together, to control the robot's movement in a simulation experiment. We show that there is a predictable tradeoff between the quality of the resulting schedule and the information contents of heuristic used.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ammons, J. C., Govindaraj, T. and Mitchell, C. (1986) Human aided scheduling for FMS: a paradigm for human-computer interaction in real time scheduling and control, inProceedings of the 2nd ORSA/TIMS Conference on Flexible Manufacturing Systems, Ann Arbor, MI.

  • Ben-Arich, D., Moodie, C. L. and Chu, C. (1989) Knowledge based scheduling under unpredicted conditions: two approaches.International Journal of Production Research,27 (5).

    Google Scholar 

  • Bourne, D. and Fox, M. (1984) Autonomous manufacturing: automating the job-shop.IEEE Computer.

  • Buzacott, J. and Yao, D. (1986) Flexible manufacturing systems: a review of analytical models.Management Science,32.

  • Carrie, A. and Petsopoulos, A. (1985) Operations sequencing in an FMS.Robotica,3 (4).

  • Chang, Y. and Sullivan R. (1984) Real time scheduling of FMS, National ORSA/TIMS meeting, San Francisco, CA.

  • Chen, H. (1990) A petri net-based state transition model for optimal operator walking pattern development in GT Cells.International Journal of Production Research, forthcoming.

  • De, S. and Whinston, A. (1986) A framework for integrated problem solving in manufacturing.IIE Transactions,18 (3).

  • Erschler, J., Roubellat, F. and Thuriot, C. (1984) Periodic release strategies for FMS. National ORSA/TIMS meeting, San Francisco, CA.

  • Finke, G. and Kusiak, A. (1985) Network approach to modelling flexible manufacturing modules and cells.Revue Francaise d'Informatique et de Recherche Operationelle,10 (4).

    Google Scholar 

  • Fox, M. (1983) Constraint-directed search: a case study of job-shop scheduling, PhD Thesis. Department of Computer Science, Carnegic-Mellon University, Pittsburgh, PA.

    Google Scholar 

  • Furlani, C., Kent, E., Bloom, H. and McLean, C. (1983) The automated manufacturing research facility of the National Bureau of Standards.Proceedings of the Summer Simulation Conference, Vancouver, BC, Canada.

  • Gershwin, S., Hildebrant, R., Suri, R. and Mitter, S. (1986) A control perspective on recent trends in manufacturing systems.IEEE Control System Magazine,6 (2).

  • Groover, M. P. and Zimmers, E. W. (1980)CAD/CAM Computer-Aided Design and Manufacturing, Prentice Hall, Englewood Cliffs, NJ.

    Google Scholar 

  • Hitomi, K. and Yoshimura, M. (1986) Operations scheduling for work transportation by industrial robots in automated manufacturing systems.Material Flow,3.

  • Hitz, K. (1979) Scheduling flexible flow shops, Report no. LIDS-R-879, Laboratory for Information and Decision Systems, MIT, Cambridge, MA.

    Google Scholar 

  • Hwang, S., Barfield, B., Chang, T. and Salvendy, G. (1984) Integration of human and computers in the operation and control of flexible manufacturing systems.International Journal of Production Research,22 (5).

    Google Scholar 

  • Kamali, J., Moodie, C. and Salvendy, G. (1982) A framework for integrated assembly systems: human, automation and robots.International Journal of Production Research,20 (4).

    Google Scholar 

  • Kempf, K., Le Pape, C., Smith, S. and Fox, B. (1991) Issues in the design of AI-based schedulers: a workshop report.AI Magazine,11 (5).

  • Kusiak, A. (1985) Material handling in flexible manufacturing systems.Material Flow,2.

  • Kusiak, A. (1986) Artificial intelligence and operations research in flexible manufacturing systems.INFOR,25 (1).

  • Kusiak, A. and Chen, M. (1988) Expert systems for planning and scheduling manufacturing systems.European Journal of Operational Research,34.

  • Kusiak, A. and Heragu, S. (1987) Analysis of expert systems in manufacturing design.IEEE Transactions on systems, man, and cybernetics,17 (6).

    Google Scholar 

  • Mitchell, C., Govindaraj, T. and Ammons, J. (1985) Human supervisory control in flexible manufacturing systems, inProceedings of the 24th Conference on Decision and Control.

  • Morton, T. and Smunt, T. (1986) A planning and scheduling system for flexible manufacturing, inFlexible manufacturing Systems: Methods and Studies, Kusiak, A. (ed.), North Holland, Amsterdam.

    Google Scholar 

  • O'Grady, P. (1986)Controlling Automated Manufacturing Systems, Chapman and Hall, New York, NY.

    Google Scholar 

  • Ow, P. and Morton, T. (1988) Filtered Beam Search in Scheduling,International Journal of Production Research,26 (1).

    Google Scholar 

  • Robinson, A. and Nof, S. (1986) Flow control simulator for production systems with robots.Material Flow,3.

  • Rouse, W. (1988) The human role in advanced manufacturing systems, inExpert Systems and Intelligent Manufacturing, Oliff, M. D. (ed.), Elsevier Science.

  • Shaw, M. and Whinston, A. (1986) Application of artificial intelligence to planning and scheduling in flexible manufacturing systems, inFlexible Manufacturing Systems: Methods and Studies, Kusiak, A. (ed.), North Holland, Amsterdam.

    Google Scholar 

  • Sheridan, T. (1976) Toward a general model of supervisor control, inMonitoring Behavior and Supervisory Control, Sheridan, T. B. and Johannsen, G. (eds), Plenum Press, New York.

    Google Scholar 

  • Smith, M., Ramesh, R., Dudek, R. and Blair, E. (1986) Characteristics of U.S. flexible manufacturing systems — a survey, inProceedings of the 2nd ORSA/TIMS Conference on Flexible Manufacturing Systems. Ann Arbor, MI.

  • Stecke, K. (1985) Design, planning, scheduling, and control problems of flexible manufacturing systems,Annals of Operations Research.

  • Stecke, K. (1986) Formulation and solution of nonlinear integer production planning problems for flexible manufacturing systems.Management Science,29.

  • Stecke, K. and Solberg, J. (1981) Loading and unloading policies for a flexible manufacturing system.International Journal of Production Research,19 (5).

    Google Scholar 

  • Suri, R. and Whitney, C. K. (1984) Decision support requirement in flexible manufacturing.Journal of Manufacturing Systems,3 (1).

    Google Scholar 

  • Tanner, W. (ed.) (1979)Industrial Robots, Vol. 1: Fundamentals, Vol. 2: Applications, Society of Manufacturing Engineers, Dearborn, Michigan.

    Google Scholar 

  • Thesen, A. and Lei, L. (1986) An ‘expert’ system for scheduling robots in a flexible electroplating system with dynamically changing workloads, inProceedings of the 2nd FMS Conference for ORSA/TIMS, Ann Arbor, Michigan.

  • White, J. (1988) Material handling in integrated manufacturing systems, inDesign and Analysis of Integrated Manufacturing Systems, Date Compton, W. (ed.), National Academy Press, Washington, DC.

    Google Scholar 

  • Wilhelm, W. E. and Sarin, S. C. (1985) A structure for sequencing robot activities in machine tending applications.International Journal of Production Research,23 (1).

  • Young, R. and Rossi, M. (1988). Toward knowledge-based control of flexible manufacturing systems.IIE Transactions,20 (1).

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Chen, HG., Guerrero, H.H. A rule-based robot scheduling system for flexible manufacturing cells. J Intell Manuf 3, 285–296 (1992). https://doi.org/10.1007/BF01577270

Download citation

  • Received:

  • Accepted:

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01577270

Keywords

Navigation