State of the Sayano-Shushenskoe dam during fourfold rise of the upper pool level to the elevation of the normal pool level

  • Experience in the Operation of Structures and Equipment of Hydroelectric Stations
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    An analysis of the data of on-site observations in 1990–1993 showed that after a fourfold rise of the water level in the reservoir of the Sayano-Shushenskoe dam, a tendency toward stabilization of most monitored parameters characterizing the static behavior of the structure was noted.

  2. 2.

    The increase of the irreversible component of radial displacements, tilts, and stresses in concrete slowed. The opening at the rock-concrete contact during seasonal rises of the upper pool level is gradually stabilizing, and the depth of opening (from the upstream face) is not increasing. Although the seepage discharges through the foundation during the last four years increased, the rate of increase decreased by the end of the indicated period.

  3. 3.

    An increase of drainage discharges and a change in the piezometric heads (sometime anomalous) with the same upper pool levels indicate continuing changes in the stress state in the dam foundation, which is causing the formation of cracks in the rock mass.

  4. 4.

    The magnitude and character of the change in stresses in the arch abutments and strains in the rock mass of the bank abutments indicate that the actual yielding of the banks was greater than was assumed in the design.

  5. 5.

    Opening of horizontal joints and cracks on the upstream face within the 50-m zone from the contact during seasonal rises of the UPL to the NPL is continuing. Here a tendency toward penetration of the opening into the depths of the concrete mass is observed. The character of variation of the cantilever stresses at the upstream face in recent years indicates opening of horizontal joints and cracks at elevations higher than 50 m from the base of the structure.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. É. K. Aleksandrovskaya, “Static behavior of the Sayano-Shushenskoe dam at the last stages of filling the reservoir,” Gidrotekh. Stroit., No. 10 (1988).

  2. É. K. Aleksandrovskaya, V. P. Volkov, O. G. Margolina, L. N. Pavlovskaya, and O. N. Nosova, “State of the Sayano-Shushenskoe dam and its foundation during the first filling of the reservoir to the elevation of the normal pool level,” Gidrotekh. Stroit., No. 1 (1992).

  3. É. K. Aleksandrovskaya, “Stress-strain state of the Sayano-Shushenskoe dam during filling of the reservoir,” Gidrotekh. Stroit., No. 3 (1986).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 10, pp. 42–45, October, 1994.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Aleksandrovskaya, É.K. State of the Sayano-Shushenskoe dam during fourfold rise of the upper pool level to the elevation of the normal pool level. Hydrotechnical Construction 28, 630–634 (1994). https://doi.org/10.1007/BF01545949

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01545949

Keywords

Navigation