Skip to main content
Log in

Reconstruction of the Samara hydroelectric station as an energy-storage hydroelectric station with ecologization of the Volga and Don

  • Discussions
  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. V. D. Novozhenin and G. L. Surukhanov, “Reduction of water levels in Volga reservoirs,” Gidrotekh. Stroit., No. 8 (1991).

  2. P. R. Khlopenkov, Author's Certificate No. 1142654, “Method of regulating water release of an energy-storage hydroelectric station,” Otkr. Izobret., No. 8 (1985).

  3. P. R. Khlopenkov, Author's Certificate No. 1204775, “Turbine-pump unit of an energy-storage hydroelectric station,” Otkr. Izobret., No. 2 (1986).

  4. P. R. Khlopenkov, “Energy-storage hydroelectric station and method of regulating its water release,” Otkr. Izobret., No. 3 (1992).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 38–43, January, 1993.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Khlopenkov, P.R. Reconstruction of the Samara hydroelectric station as an energy-storage hydroelectric station with ecologization of the Volga and Don. Hydrotechnical Construction 27, 38–45 (1993). https://doi.org/10.1007/BF01545556

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01545556

Keywords

Navigation