Seepage and cutoff measures in the foundation of the Inguri arch dam

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    Systematic on-site observations of seepage were carried out during construction of the high-head arch dam of the Inguri hydrostation, from the results of which a refined model of permeability was drawn up, the effectiveness of the cutoff measures taken was assessed, and additional works were performed as necessary.

  2. 2.

    The seepage inflow into the drainage system and galleries of the underground contour was 400 liters/sec at a reservoir elevation of 410 m and about 1.9 m3/sec at the elevation of the NPL 510 m. This value changed little during each next filling of the reservoir to the NPL in 1989–1991 (1.95, 1.86, 1.83 m3/sec).

  3. 3.

    The grout curtain and drainage operate effectively and stably and reliably protect the bank abutments of the rock mass from water invasion.

    Some changes in the distribution of heads in the dam foundation are occurring in the plug part and its left-bank abutment at high levels and fluctuations of the reservoir as a result of decompression of the rocks and its change under the upstream face.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. A. K. Mastitskii, G. M. Dzhigauri, and S. B. Kereselidze, “Engineering-geological characteristics of the foundation of the arch dam of the Inguri hydroelectric station,” Gidrotekh. Stroit., No. 6 (1974).

  2. G. G. Tuzhikhin, “Cutoff measures planned in the foundation of the arch dam of the Inguri hydroelectric station,” in: Collection of Abstracts of Papers Presented at the All-Union Scientific-Technical Conference [in Russian] (1972).

  3. L. I. Malyshev, V. V. Kotul'skii, and N. I. Shevchenko, “Results of on-site studies of seepage in the dam foundation of the Inguri hydroelectric station during pumping of water from the pit,” in: Collection of Scientific Works of Gidroproekt [in Russian], No. 49 (1976).

  4. L. I. Malyshev and N. I. Shevchenko, “Estimation of the seepage parameters of rocks on the basis of fluctuations of the water table,” Inzh. Isysk. Stroit., Ser II, No. 2 (33).

  5. L. I. Malyshev, “Seepage model of rock foundations of high-head dams,” in: Collection of Papers of the Third International Symposium “Seepage Waters in Porous Media” [in Russian], Pt. III, Kiev (1978).

  6. L. I. Malyshev, K. I. Maksimov, and P. S. Sokolovskii, “On-site investigations of seepage in the dam foundation of the Inguri hydroelectric station during construction,” Gidrotekh. Stroit., No. 12 (1979).

  7. E. V. Krylova, M. B. Remenyak, and G. G. Tuzhikhin, “Grout curtain in the foundation of the Inguri arch dam,” Gidrotekh. Stroit., No. 10 (1980).

  8. L. I. Malyshev and A. G. Kabanov, “Results of model and on-site studies of seepage in the foundation of the Inguri arch dam,” in: Collections of Works of Gidroprotek [in Russian], No. 75 (1982).

  9. E. S. Baranos, G. G. Tuzhikhin, and T. N. Ryumina, “Cutoff and blanket grouting measures on structures of the Inguri hydroelectric station,” in: Collection of Scientific Works of Gidroproekt [in Russian], No. 94 (1984).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 2, pp. 9–17, February, 1993.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Malyshev, L.I., Tuzhikhin, G.G. Seepage and cutoff measures in the foundation of the Inguri arch dam. Hydrotechnical Construction 27, 55–65 (1993). https://doi.org/10.1007/BF01545430

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01545430

Keywords

Navigation