Skip to main content
Log in

Stabilization of a potentially unstable rock mass at the construction site of the Sayano-Shushenskoe hydroelectric station

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 25–28, January, 1992.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Zhivoderov, V.N. Stabilization of a potentially unstable rock mass at the construction site of the Sayano-Shushenskoe hydroelectric station. Hydrotechnical Construction 26, 34–38 (1992). https://doi.org/10.1007/BF01545346

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01545346

Keywords

Navigation