Skip to main content
Log in

Some results of fifteen years of operation of the Sayano-Shushenskoe hydropower complex

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 1–3, April, 1994.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bryzgalov, V.I. Some results of fifteen years of operation of the Sayano-Shushenskoe hydropower complex. Hydrotechnical Construction 28, 189–191 (1994). https://doi.org/10.1007/BF01545051

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01545051

Keywords

Navigation