Use of trench and pit crater charges at the construction site of the Hoa-Binh hydro development

  • Foreign Experience and Techniques
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    Crater blasting by trench and pit explosive charges made it possible in the shortest time to open and subsequently eliminate the cofferdams of the diversion canal at the construction of the Hoa-Binh hydro development.

  2. 2.

    For using the available experimental and calculation-methodological principles of crater blasting in the less studied practice of blasting cofferdams and embankments, it is expedient to keep as one of the main calculation parameters the “index of action of the blast,” having transformed it to the ratio of the depth of the blasted cut and depth of the charge.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel stvo, No. 8, pp. 57–60, August, 1986.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Kuznetsov, V.A. Use of trench and pit crater charges at the construction site of the Hoa-Binh hydro development. Hydrotechnical Construction 20, 517–521 (1986). https://doi.org/10.1007/BF01459317

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01459317

Keywords

Navigation