Characteristics of the organization and performance of works in the dam foundation of the al-Hadithah hydro development (Iraq)

  • Foreign Experience and Techniques
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The performance of the massive grouting operations in the dam foundation of the al-Hadithah hydro development within the prescribed time and with a high quality was possible only thanks to maximum industrialization of industry and technology. Together with the necessary organizational and technical measures on intensifying the construction process, the use of unified schemes of equipping the grouting stretches with performance of the works from a concrete slab and from a grouting gallery was the main measure.

  2. 2.

    The drilling and grouting equipment manufactured in the USSR showed a high operating reliability.

  3. 3.

    The methods and technology of the grouting works used at the al-Hadithah hydro development should be recognized as the most economical from the viewpoint of the time and quality of the works and they can be recommended for use under conditions of Soviet hydro-technical construction.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. N. V. Dmitriev, K. A. Loginov and L. I. Malyshev, “Technology and results of grouting in the dam foundation of the Al-Hadithah hydro development in Iraq,” S. Gidroproekta, No. 104 (1984).

  2. I. É. Gorbunov, “Organization of the preparation and delivery of grout during grouting of rocks at the Al-Hadithah hydro development in Iraq,” Sb. Gidroproekta, No. 104 (1984).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 53–56, September, 1987.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Dmitriev, N.V., Malyshev, L.I., Ashikhmen, V.A. et al. Characteristics of the organization and performance of works in the dam foundation of the al-Hadithah hydro development (Iraq). Hydrotechnical Construction 21, 563–569 (1987). https://doi.org/10.1007/BF01442643

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01442643

Keywords

Navigation