Increase of the reliability and convenience of operation of the group active power regulation system of a hydroelectric station

  • Experience in the Operation of Hydraulic Structures and Equipment of Hydroelectric Stations
  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The improved central regulator developed by Soyuztekhénergo contains two power regulators united by a technological scheme with modernized components of the standard regulator.

  2. 2.

    To increase the reliability and convenience of operation of the group active power regulation (control) systems of hydrostations it is expedient during mass production of the apparatus at Soyuzénergoavtomatika to periodically modernize it.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. G. S. Kiselev, M. Ya. Rudenskii, and R. M. Épshtein, Group Power Regulation System of Hydroelectric Stations [in Russian], Énergiya, Moscow, 1974.

    Google Scholar 

  2. G. S. Kiselev, M. Ya. Rudenskii, and R. M. Épshtein, Technical Requirements Imposed on Group Active Power Regulation Systems of Hydroelectric Stations [in Russian], Minénergo SSSR, STsNTI ORGRÉS, Moscow (1971).

    Google Scholar 

  3. M. Ya. Rudenskii, “Creation of a standard central regulator of the GAPR system and ways to improve it,” Gidrotekh. Stroit., No. 9 (1981).

  4. K. E. Baskin and M. Ya. Rudenskii, “Diagnosis and increase of the reliability of group active power regulation systems of hydroelectric stations,” Gidrotekh. Stroit., No. 10 (1981).

  5. K. E. Baskin, L. S. Gol'dberg, V. V. Kamosko, et al., “Method of group active power regulation of electric stations with continuous automatic check and protection and a system for its realization,” USSR Patent No. 843144, Okrytiya. Izobreteniya, No. 24 (1981).

  6. E. I. Kravtsova, L. S. Gol'dberg, A. A. Pimburgskii, and M. Ya. Rudenskii, and V. V. Kamosko, Methodological Instructions on Technical Servicing of the Central Regulator of the GAPR System [in Russian], SPO Soyuztekhénergo, Moscow (1986).

    Google Scholar 

  7. I. B. Berlin, B. M. Lukin, P. N. Makaritskii, et al., “Testing of the group active power and frequency regulation system of the units of the Bratsk hydroelectric station,” Élektron. Stan., No. 1 (1984).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 9, pp. 39–42, September, 1987.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Rudenskii, M.Y. Increase of the reliability and convenience of operation of the group active power regulation system of a hydroelectric station. Hydrotechnical Construction 21, 548–551 (1987). https://doi.org/10.1007/BF01442640

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01442640

Keywords

Navigation