Provision of the design travel path of formwork during concreting of the penstocks of the Sayano-Shushenskoe hydroelectric station

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. G. I. Geksin et al., “Moving form for constructing in situ reinforced-concrete structures, mainly penstocks,” Inventor's Certificate No. 789659, Otrkyt. Izobret., No. 47 (1980).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 3, pp. 5–8, March, 1988.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Grachev, D.M. Provision of the design travel path of formwork during concreting of the penstocks of the Sayano-Shushenskoe hydroelectric station. Hydrotechnical Construction 22, 139–144 (1988). https://doi.org/10.1007/BF01441066

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01441066

Keywords

Navigation