Skip to main content
Log in

Economic assessment of renewability of hydroelectric power resources

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. Standard Method of Determining the Economic Effectiveness of Capital Investments [in Russian], Izd. Akad. Nauk SSSR, Moscow (1980).

  2. The USSR Economy in 1980. Statistical Yearbook [in Russian], Finansy i Statistika, Moscow (1981).

  3. V. I. Gorin et al., “Ways of reoutfitting thermal power stations,” Elektron. Stan., No. 2 (1982).

  4. B. L. Érlikhman, “Problems of the long-range development of the hydroelectric power industry,” Izv. Vyssh. Uchebn. Zaved., Energ., No. 1 (1976).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 12, pp. 8–10, December, 1984.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Érlikhman, B.L. Economic assessment of renewability of hydroelectric power resources. Hydrotechnical Construction 18, 572–576 (1984). https://doi.org/10.1007/BF01440637

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01440637

Keywords

Navigation