Skip to main content
Log in

Preparation of the structure of the Hoa-Binh hydro development for passage of the flood

  • Published:
Hydrotechnical Construction Aims and scope

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Literature cited

  1. P. T. Bogachenko, A. B. Vasil'ev, B. I. Godunov, and Thai Phung Ne, “The Hoa-Binh hydro development on the Da River in Vietnam,” Gidrotekh. Stroit., No. 11 (1984).

  2. P. T. Bogachenko, B. I. Godunov, and Thai Phung Ne, “Characteristic of the contruction of the dam at the Hoa-Binh hydro development in Vietnam in the first phase of construction,” Gidrotekh. Stroit., No. 12 (1984).

  3. P. T. Bogachnko, B. I. Godunov, A. V. Shlychkov, et al., “Damming of the channel of the Da River at the construction site of the Hoa-Binh hydro development in Vietnam,” Gidrotekh. Stroit., No. 1 (1985).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 2, pp. 52–55, February, 1985.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Bogachenko, P.G., Godunov, B.I. & Tsedrov, G.N. Preparation of the structure of the Hoa-Binh hydro development for passage of the flood. Hydrotechnical Construction 19, 96–101 (1985). https://doi.org/10.1007/BF01440451

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01440451

Keywords

Navigation