Conditions of the combined static work of a precast concrete-encased steel conduit and pile grillage

  • Published:
Hydrotechnical Construction Aims and scope

Conclusions

  1. 1.

    The original calculation scheme in which the entire static load from the conduit is transmitted to the capping beams does not take into account practically the combined work of the entire structure of the conduit. To provide the combined work of the conduit and capping beams it is necessary to limit the initial opening of the joints due to shrinkage and temperature variations to 0.4–0.5 mm. As the calculations show, this is feasible even at the maximum possible rate of the works.

  2. 2.

    The rigidity of the interacting structure of a large-diameter conduit and pile grillage is considerably higher than the rigidity of capping beams, which leads to a decrease of forces in the capping beams and increases the bearing capacity and reliability of the conduit. Consideration of the combined work of the conduit and pile grillage makes it possible to reduce the consumption of reinforcement in the capping beams and to equalize the deformations of the foundation within the section.

  3. 3.

    The combined work of precast elements of a concrete-encased steel conduit of a pumped-storage station and pile grillage is provided by welding the embedded parts of the precast elements and capping beams, and also by high-quality sealing of the joints between elements. The static work of the precast structure in this case becomes close to the work of a monolithic structure.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Literature cited

  1. S. A. Berezinskii, A. V. Egorov, V. S. Lashmanova, and I. A. Polinkovskii, “Design of conduits of pumped-storage stations,” Gidrotekh. Stroit., No. 4 (1985).

  2. B. V. Fradkin, V. V. Golovin, and L. M. Shatova, “The ‘Bolid’ set of programs for solving two-dimensional steady-state problems of the theory of elasticity, thermal conductivity, and artesian groundwater flow on the BÉSM-6 computer. Experience in Development and Operation,” Tr. Gidroproekta, Moscow, No. 85 (1983).

  3. Construction Specifications and Regulations. Design Standards. Concrete and Reinforced-Concrete Structural Elements of Hydraulic Structures. SNiP II-56-77 [in Russian], Stroiizdat (1977).

Download references

Authors

Additional information

Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 36–41, August, 1985.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Berezinskii, S.A., Kogan, E.A., Mgalobelov, Y.B. et al. Conditions of the combined static work of a precast concrete-encased steel conduit and pile grillage. Hydrotechnical Construction 19, 432–437 (1985). https://doi.org/10.1007/BF01439558

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF01439558

Keywords

Navigation